Configuration/project planning SWS Gateway
Scope of delivery
- Configuration of gateway according to customer specifications
- Preparation of 2 data point lists and 1 dispatch (required for commissioning)
- Available on request.
- Data point list of the SWS server created by the gateway on the part of the customer. In the case of support by a SCHELL employee, additional costs will be incurred according to expenditure: e.g. kilometres for arrival and departure, working hours and travel time.
- List of the desired data points.
PT1000 temperature sensor for use with SWS water management system to measure...
Ball valve with maintenance-free, electric actuator for period-controlled,...
Ball valve with maintenance-free, electric actuator for period-controlled,...
For WC module MONTUS Flow.
Temperature sensor for use in the SWS water management system. For recording the...