Integrated efficiency: manage stagnation flushes across all key tapping points with SWS
The SCHELL SWS Water Management System is the ideal tool for ensuring efficient water management in public, semi-public and commercial buildings.
Learn moreAs a systems provider, SCHELL can naturally offer matching installation elements for exposed or concealed installation for all professional fittings in its portfolio – whether for wash basins, showers, WCs or urinals. High standards for structure-borne noise also ensure compliance with DIN 4109 regarding noise protection in building construction. These practical pre-wall elements for public and commercial sanitary facilities are designed to make the tradesperson’s job easier.
SCHELL installation elements are available in many designs and dimensions. For drywalls or masonry, for loads up to 400 kg, for free-standing stud partitions and pre-wall installation, where space is limited and with advanced filling systems – to put it simply: for any job on any site.
All module versions and their technical drawings are available here.
Wash basin mounting module, height 124 cm. For stud wall or pre-wall mounting or...
Wash basin mounting module, height 115 cm. For stud wall or pre-wall mounting or...
Wash basin mounting module, height 115 cm. For stud wall or pre-wall mounting or...
Shower module, height 223.3 cm. For stud wall or pre-wall mounting or exposed...
Type COMPACT II
WC module, height 115 cm with concealed COMPACT II flush valve. For stud wall or...
Type C 120
WC module, height 115 cm with concealed cistern 12 cm. For stud wall or pre-wall...
Type C-N 120
WC module with concealed cistern 12 cm. For expansion, installation and conversion...
Type C-N 80
WC module with concealed cistern 8 cm. For expansion, installation and conversion...
Type 820 C, actuation from top or front.
WC module, height 82 cm with concealed cistern 15 cm. For stud wall or pre-wall...
Type C 90
WC module, height 111 cm with concealed cistern 8 cm. For flat stud...
Type C 80
WC module, height 115 cm with concealed cistern 8 cm. For stud wall or pre-wall...
Type C 80 n
WC module with concealed cistern 8 cm without frame. For expansion, installation...
Type CS 120
WC module, height 115 cm with concealed cistern 12 cm. For barrier-free WCs. For...
Type C 120
WC module, height 115 cm with concealed cistern 12 cm. For stud wall or pre-wall...
Type C 120 n
WC module with concealed cistern 12 cm without frame. For expansion, installation...
Type C 120
WC module, height 115 cm with concealed cistern 12 cm. For stud wall or pre-wall...
Type COMPACT II
Urinal module, height 115 cm with concealed COMPACT II flush valve. For stud wall...
Type COMPACT II LC
Urinal module, height 115 cm with concealed COMPACT II flush valve. For stud wall...
Urinal module, height 115 cm. For stud wall or pre-wall mounting or exposed...
High-load mounting module, height 115 cm. For stud wall or pre-wall mounting or...
Bidet module, height 115 cm. For stud wall or pre-wall mounting or exposed...
For attaching MONTUS modules for exposed installation. Tool-less depth adjustment...
For mounting the SWS Bus Extender or SSC Bluetooth modules.
For attaching MONTUS modules for exposed installation. Tool-less depth adjustment...
For attaching a SCHELL module in front of a solid wall. Continuous depth...
For WC module MONTUS Flow.
Temperature sensor for use in the SWS water management system. For recording the...
For wall-mounted WC and bidet. Compensation backfill between ceramic unit and...
With dual lip seal.
For PE wall-WC drain elbow with double lip seal.
The BIM/CAD service ensures straightforward integration of SCHELL products into digital project planning work.
At SCHELL, sustainability is part of our company DNA.
The SCHELL SWS Water Management System is the ideal tool for ensuring efficient water management in public, semi-public and commercial buildings.
Learn moreOliver Steffens, Head of Applications Engineering Germany/Service at SCHELL, recommends contactless electronic fittings as one of the best ways to ensure the maintenance of user and drinking...
Learn moreWhile the Easter Bunny is still busy doing his rounds, the lights are already off in many buildings – which is a recipe for the slow stagnation of water in drinking water systems over Easter. ...
Learn moreIn a new episode of ‘Erfrischend klar…’ (‘Refreshingly clear…’), Bastian Valbert talks to SHK.RADIO about SCHELL’s top five special angle valves.
Learn more